Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4363063 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Maint To Geyser, Ceiling Fans, Exhaust Fans, Refrigerator, Ac, Domestic Ro 15 To 50 Ltrs Etc And Other Connected Works In Certain Building Of All Rr Units Of Hq Cif(k) Under Age (i) Cif (k) |
| Last Date For Submission | 18th Jun, 2026 |
| Opening Date | 20 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 17200.00 |
| Estimated Cost | 860000.00 |
| City | Multi city |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling and lowering to ground for repair, inspecting defective parts of Window and split type AC of capacity 1.5 and 2 Ton and re-installing the same after repair and descaling of condenser and servicing complete, testing to the complete satisfaction of Engr-in-Charge | 20.00 | Each Job |
| 2 | Taking out the existing burntout compressor and supply & replacement of compressor sealed unit suitable for ACs 1.5 Ton capacity including flushing, vaccumising and hydration the system, leakage testing, welding/soldering as required and charging refrigerant gas, reinstalling in position and testing for the desired condition including including replacement of strainer complete all as directed. Make- Kirloskar/ Tecumseh | 4.00 | Each |
| 3 | Taking out the existing burntout compressor and supply & replacement of compressor sealed unit suitable for ACs 2 Ton capacity including flushing, vaccumising and hydration the system, leakage testing, welding/soldering as required and charging refrigerant gas, reinstalling in position and testing for the desired condition including including replacement of strainer complete all as directed. Make- Kirloskar/ Tecumseh | 5.00 | Each |
| 4 | Material and labour for charging of gas in window type AC 1.5/2 Ton after flushing, vaccumising and hydration as per laid down standard practice including replacement of copper strainer complete as directed. | 15.00 | Each Job |
| 5 | Material and labour for charging of gas in split ype AC 2 Ton after flushing, vaccumising and hydration as per laid down standard practice including replacement of copper strainer complete as directed. | 13.00 | Each Job |
6 Days Left