Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3871876 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair/maint Of B/r Assets At Various Units Under Age B/r (p) Khanabal Of Ge 861 Ews |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 56000.00 |
| Estimated Cost | 2800000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as specified and directed by Engineer-in-Charge. | 464.00 | Sqm |
| 2 | Supply & Fixing Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and as directed by Engineer-in-Charge. | 434.00 | Sqm |
| 3 | Supply & Fixing Pre-painted galvalume aluminum zinc coating GI based Plain steel sheet 0.50mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and as directed by Engineer-in-Charge. | 30.00 | Sqm |
| 4 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) with and including removing rubbish material from building and thrown in low lying empty area complete all as specified and as directed by Engineer-in-charge. | 466.00 | Sqm |
| 5 | Material and Labour for Virified Ceramic tiles light shade 10 mm thick (square/rectangular) polished, (shade as approved by Engineer-in-charge ) , area of each tiles not exceeding 0.36 sqm , in floors etc. set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured/ shade cement to match the colour / shade of tiles , laid over with and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 230.00 | Sqm |
6 Days Left