| 1 | Schedule 'A' | | |
| 2 | Material and labour for conducting B check of DG Set 500 KVA capacity Make: Kirloskar at 183 MH DG sets of above capacity installed at 183 MH to carry out maintenance / servicing as given below all as directed:-
(i) Change of diesel filter/oil filter/Air filter/top up/replacement of engine oil, coolant if required.
(ii) Check and clean engine, alternator battery,instrument panel, elect panel, Timer, Contactors ,Meters and others etc.
(iii) Tightening of all nuts & bolts of DG set and its accessories.
(iv) Check for any diesel lekage from any point and rectify if observed.
(v) Check and adjust fan belt tension, replace the fan belts if found damaged.
(vi) Check leakage of smoke from exhaust system/silencer,Repair if required.
(vii) Check electrical connections of engine .The wiring shall be maintened properly and engine starting system from engine instrument panel is to be kept in order
(viii) Check and tighten the AVM pads nuts and bolts, change AVM pads if found damaged.AVM to be provided by contractor.
(ix) Check exhaust pipe, flange and lagging Repair if found damaged.
(x) Check output of alternator ,if found OK adjust the same to specified values in case of brush type.
(xi) Checking of all hoses and cleanup,change/tighten if required. (xii) Checking of all hoses and cleanup if required. Also changing air filter elements,if required. (xiii) Oiling,Greasing and checking for proper & smooth functioning. etc and refitting, testing on load complete (Note :- Spares parts/ Engine oil/coolant /distilled water etc. will be measured and paid separately .) | 1.00 | Each Job |
| 3 | Material and labour for conducting B check of DG Set 160 KVA capacity Make: Kirloskar at High Lift Pump House DG sets of above capacity installed at above location to carry out maintenance / servicing as given below all as directed:-
(i) Change of diesel filter/oil filter/Air filter/top up/replacement of engine oil, coolant if required.
(ii) Check and clean engine, alternator battery,instrument panel, elect panel, Timer, Contactors ,Meters and others etc.
(iii) Tightening of all nuts & bolts of DG set and its accessories.
(iv) Cleaning the fuek tank with the help of kerosene oil including replacement of level indicator pipe.
(v) Check for any diesel lekage from any point and rectify if observed.
(vi) Check and adjust fan belt tension, replace the fan belts if found damaged.
(vii) Check leakage of smoke from exhaust system/silencer,Repair if required.
(viii) Check electrical connections of engine .The wiring shall be maintened properly and engine starting system from engine instrument panel is to be kept in order
(ix) Check and tighten the AVM pads nuts and bolts, change AVM pads if found damaged.AVM to be provided by contractor.
(x) Check exhaust pipe, flange and lagging Repair if found damaged.
(xi) Check output of alternator ,if found OK adjust the same to specified values in case of brush type.
(xii) Checking of all hoses and cleanup,change/tighten if required. (xiii) Checking of all hoses and cleanup if required. Also changing air filter elements,if required. (xiv) Oiling,Greasing and checking for proper & smooth functioning. etc and refitting, testing on load complete (Note :- Spares parts/ Engine oil/coolant /distilled water etc. will be measured and paid separately .) | 1.00 | Each Job |
| 4 | Material and labour for conducting B check of DG Set 100 KVA capacity Make: Kirloskar at 183 MH & 57 MDSR, DG sets of above capacity installed at above location to carry out maintenance / servicing as given below all as directed:-
(i) Change of diesel filter/oil filter/Air filter/top up/replacement of engine oil, coolant if required.
(ii) Check and clean engine, alternator battery,instrument panel, elect panel, Timer, Contactors ,Meters and others etc.
(iii) Tightening of all nuts & bolts of DG set and its accessories.
(iv) Check for any diesel lekage from any point and rectify if observed.
(v) Check and adjust fan belt tension, replace the fan belts if found damaged.
(vi) Check leakage of smoke from exhaust system/silencer,Repair if required.
(vii) Check electrical connections of engine .The wiring shall be maintened properly and engine starting system from engine instrument panel is to be kept in order
(viii) Check and tighten the AVM pads nuts and bolts, change AVM pads if found damaged.AVM to be provided by contractor.
(ix) Check exhaust pipe, flange and lagging Repair if found damaged.
(x) Check output of alternator ,if found OK adjust the same to specified values in case of brush type.
(xi) Checking of all hoses and cleanup,change/tighten if required. (xii) Checking of all hoses and cleanup if required. Also changing air filter elements,if required. (xiii) Oiling,Greasing and checking for proper & smooth functioning. etc and refitting, testing on load complete (Note :- Spares parts/ Engine oil/coolant /distilled water etc. will be measured and paid separately .) | 2.00 | Each Job |
| 5 | Material and labour for conducting B check of DG Set 62.5 KVA capacity Make: Kirloskar at 183 MH & KLP Pump House, DG sets of above capacity installed at above location to carry out maintenance / servicing as given below all as directed:-
(i) Change of diesel filter/oil filter/Air filter/top up/replacement of engine oil, coolant if required.
(ii) Check and clean engine, alternator battery,instrument panel, elect panel, Timer, Contactors ,Meters and others etc.
(iii) Tightening of all nuts & bolts of DG set and its accessories.
(iv) Check for any diesel lekage from any point and rectify if observed.
(v) Check and adjust fan belt tension, replace the fan belts if found damaged.
(vi) Check leakage of smoke from exhaust system/silencer,Repair if required.
(vii) Check electrical connections of engine .The wiring shall be maintened properly and engine starting system from engine instrument panel is to be kept in order
(viii) Check and tighten the AVM pads nuts and bolts, change AVM pads if found damaged.AVM to be provided by contractor.
(ix) Check exhaust pipe, flange and lagging Repair if found damaged.
(x) Check output of alternator ,if found OK adjust the same to specified values in case of brush type.
(xi) Checking of all hoses and cleanup,change/tighten if required. (xii) Checking of all hoses and cleanup if required. Also changing air filter elements,if required. (xiii) Oiling,Greasing and checking for proper & smooth functioning. etc and refitting, testing on load complete (Note :- Spares parts/ Engine oil/coolant /distilled water etc. will be measured and paid separately .) | 2.00 | Each Job |