Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3836759 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair/replacement Of Old Unserviceable Internal Wiring And Connected Building Items For Md Accn At Lgj Mil Stn |
| Last Date For Submission | 22nd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 80000.00 |
| Estimated Cost | 4000000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down carefully copper/aluminium point wiring of any size (light, socket or power) complete (fittings such as switches, ceiling roses, pendants, regulatos, sockets etc to be measured separately), and making good disturbed surfaces of walls, floors etc to match with existing surfaces. | 1150.00 | Per Point |
| 2 | Taking down MCB with sheet metal enclosure, main switch, DB etc and making good disturbed surfaces to match with existing surfaces. | 80.00 | Each |
| 3 | Taking down sub main wiring of any size/capacity complete all as specified and making good disturbed surfaces to match with the existing surfaces | 732.00 | RM |
| 4 | M&L for concealed Point wiring for One light, one way switch controlled by one, oneway switch with single core PVC insulate, unsheathed multistranded copper conductor cable of size 2.5 sq.mm (FLRSH) drawn in and including electrical grade PVC conduit 20 mm dia concealed on wall/ceiling/floor including PVC insulated unsheathed earth wire with multi stranded copper conductor of size 2.5 sq.mm(FLRSH) including MS shunk sheet metal box with 3 mm thick bakelite plastic laminated sheet top cover with brass counter shunk screws with washer complete all as specified. Note - quoted rate shall include making good to the disturbed surfaces including plastering and painting to match with the existing colour. | 600.00 | Point |
| 5 | All as per srl item No 4 above, but for One 3 pin switch socket outlet, 5 Amp on the same board with other switches all as specified and directed by Engineer-in-Charge | 60.00 | Point |
6 Days Left