Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4341832 |
|---|---|
| Organisation Name | Haryana Urban Development Authority |
| Tender Brief | Corrigendum : Replacement Of Old D.g. Set With New 125 Kva D.g. Set For Administrator Office Building In Sector-14 And 25 Kva D.g. Set In Electrical Division Sector-15-ii Hsvp Gurugram (including One Year Mtc./service And Defect Liability Period Free Of Cost) |
| Last Date For Submission | 1st Jun, 2026 |
| Opening Date | 01 Jun, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 63650.00 |
| Estimated Cost | 3182187.00 |
| City | Multi city |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | [24.1.6]EARTHING AND LIGHTENING ARRESTOR. Supplying and laying 25mm x 3mm G.I. strip at 0.5 metre below ground as strip earth electrode including soldering etc. as required. | 200.00 | mtr. |
| 2 | [24.7.1]RCC FOUNDATIONS FOR DG SET. 30 to 40 KVA DG Set | 1.00 | Nos |
| 3 | [24.7.4]RCC FOUNDATIONS FOR DG SET. 125 KVA DG Set | 1.00 | Each pair |
| 4 | [23.22.1.11]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 200 to 250 amp, 25 KA | 6.00 | Nos |
| 5 | [23.22.1.12]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 300 to 400 amp , 50 KA | 2.00 | Nos |
5 Days Left