| Tender ID | 4986190 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Resurfacing Of Helipad Ground P-61 And Approached Road At Hq Sect Rr Under Age (i) Cif (k) |
| Last Date For Submission | 14th Aug, 2026 |
| Opening Date | 17 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 37760.00 |
| Estimated Cost | 1888000.00 |
| City | Multi city |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bag or mechanical air compressor to remove loose dirt etc, and applying evenly a priming/ tack coat an existing black top surfaces with bituminous primer @ 05 Kg per 10Sqm using paving bitumen of grade VG-10 of road surface by sprayer operated hot pressure mechanism and providing, laying, spreading bituminous premix asphaltic semi dense concrete (SDAC) 40mm thick (consolidated thickness) with 5.5% binder content of paving bitumen of grade VG-30 by weight of total mix, rolled and compacted to required camber and gradient using 10 to 12 tonne power roller and vibromax roller to a uniform smooth surfaces complete all as specified and directed. Notes :- (a) Bituminous premix semi dense asphaltic concrete shall be prepared in central computerised hot mix plant. (b) Design mix shall be got done by the contractor at his own expenses from NABL laboratory as decided by GE/AGE(I). (c) Contractor shall quote his rates by considereing binder contents @ 5.5% of total mix by weight, however in case of any variation in weight of binder contents on lower side as per actual mix design, the same shall be ajusted @ Rs. 80.00 Per Kg of bitumen. | 360.00 | 10 Sqm |
| 2 | M&L repair to potholes, area not exceeding 1.0 Sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads, paths etc. cutting around edges to at least 25mm in depth, making good by filling in screened and graded road metal, watering and well ramming and applying a tack coat with bituminous primer @ 5 Kg per 10 Sqm of paving bitumen of Grade VG-10, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 Kg per 10 Sqm using paving bitumen of grade VG-30, binded with 0.09 Cum of stone chippings 6.3mm size and again well rammed (including supply of premixed macadam, binder and chippings), depth of potholes exceeding 30mm, complete all as specified and as directed. | 5.00 | 10 Sqm |
| 3 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exceeding 400 Sqm and thickness or depth exceeding 50mm but not exceeding 100mm and removing thereof as accounted under credit, complete all as specified and as directed. | 16.00 | 10 Sqm |
| 4 | M&L premixed bituminuous macadam using 4% binder content of paving bitumen of Grade VG-30 by weight of total mix (consolidated thickness 75mm or less), laying with mechanical paver and rolled and compacted to required camber and gradient with using 10 to 12 tonne power roller, complete all as specified and directed. Notes :- (a) Premixed Bituminuous Macadam shall be laid using self propelled hydrostatic paver finisher and preparation of mix shall be using hot mix plant and transporting the mix in tipper. (b) The exact bitumen content required shall be determined follwing the Mix Design procedure contained in the Asphalt Institute Manual MS-2 (Sixth Edition) as referred in case 3.5.3 of IRC 111:2009. The adjustment in rate due to variation in quantity of bitumen if any shall be priced at the rate of Rs. 80.00 Per KG of bitumen. | 6.40 | Cum |
| 5 | M&L applying evenly a priming/ tack coat with bituminous primer @ 10 KG/ 10 Sqm of road surfaces using paving bitumen of Grade VG-10, complete all as specified and directed. | 16.00 | 10 Sqm |