Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3265508 |
|---|---|
| Organisation Name | Ministry Of Road Transport And Highways |
| Tender Brief | Corrigendum : Short Term Maintenance Contract Stmc From Km 50 To Km 89 30 On Nh150a Hattigudur Tinthani Section For The Year 2025 26 Pertaining To National Highway Division Kalaburagi In The State Of Karnataka |
| Last Date For Submission | 1st Apr, 2026 |
| Opening Date | 02 Apr, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 408113.00 |
| Estimated Cost | 40811337.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | MoRT&H-201 Clearing and grubbing road land;-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shurbs, saplings and trees upto girth 300mm, removal of stumps of trees cut earlier and disposal of unservicable materials and stacking of servicable materials to be used or auctioned, upto a lead of 1000mtrs including removal and disposal of top organic soil not exceeding 150mm in thickness including all labour, hire charges of all machineries etc... complete. By mechanical means in area of light jungle | ||
| 2 | From Km 50.00 to 89.30 of NH-150A (As per Detailed Estimate) | 9.254 | Hect. |
| 3 | Maintenance of Earth Shoulder (stripping excess soil),Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, including all labour, usage charges of machinery, lead, lifts, loading, unloading disposal of earth etc., complete | ||
| 4 | From Km 50.00 to 89.30 of NH-150A (As per Detailed Estimate) | 53984.000 | Sqm |
| 5 | MoRT&H 3003-Maintenance of Earthen Shoulder (filling with fresh soil): Making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil upto 150mm excavated by excavator, carriage by tipper and compacting it with plate compactor to the desired field density including cost of all materials, labour, hire charges of machinery, loading, unloading, lead & lift etc., complete. |
3 Days Left