Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: NHPC Limited
Tender ID3609700
Organisation NameNHPC Limited
Tender BriefCorrigendum : Slope Protection Of Slide Area On Left Side Of Downstream Of Dam Of Parbati-iii Power Station
Last Date For Submission6th Apr, 2026
Opening Date09 Apr, 2026
Cost
Document Cost5900.00
EMD4000000.00
Estimated Cost249207749.00
Location
CityMulti city
StateMulti State

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Hard rock (blasting prohibited)533.64CUM
2Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil3665.98CUM
3Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock2791.98CUM
4Supply and Installation of Self Drilling Anchors made of 40CR material with outer dia. of 38mm and inner dia. of 19mm, yield load carrying capacity of minimum 400KN in soil/ overburden/rock suitable for drilling placing and cement grouting. Installation with all accessories such as 75mm dia. drill bit, couplers,10mm thick base plate and nuts & bolts complete in all respect but excluding the cost of cement grouting which will be paid extra as per relevant BOQ Item.37937.00RMT
5Cement pressure grouting through hollow soil/ solid rock anchor of outer dia. 38mm in rock/over burden including all cost material & equipments required to complete the grouting work at desired pressure.5843.00Bag
6th Apr, 2026

9 Days Left