Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3781167 |
|---|---|
| Organisation Name | Gurugram Metropolitan Development Authority |
| Tender Brief | Corrigendum : Special Repair Of The Service Road And Master Road Along The Sector 3/5 Dividing Road, Gurugram, Including All Other Works Contingent Thereto |
| Last Date For Submission | 7th Apr, 2026 |
| Opening Date | 07 Apr, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 988000.00 |
| Estimated Cost | 49373284.00 |
| City | Multi city |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Recovery item-Providing and Laying 60 mm thick ISi marked lntertocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 35 over the bed of 25 mm thick fine sand complete in all respect. Note- The rates quoted against recovery item lntertocking Paver Blocks will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from site have been calculated taking assumption that 70% of theoretical material will be retrieved. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed. as Rs.273/- per sqm. | 2016 | Sqm |
| 2 | Recovery- Credit of Kerb Stone (The amount computed by rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. kerb stones obtained from dismantling of existing median, islands has been calculated taking assumption that 70% of existing kerb stones will be retrieved and can be reused by the contractor at any other site. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be considered for all purpose in case the agency quotes lesser than reserve price. The price quoted against the recovery of existing kerb stones shall have minimum reserve price of Rs. 2226/- per cum.) | 226.8 | cum |
| 3 | Providing services of qualified surveyor(s) along with all required instruments, tools, accessories and manpower for carrying out survey, establishing and recording levels and topographical details for planning and execution of works including (but not limited to) determination of finished road levels (FRL), drainage invert levels, cross-drainage/road crossing levels, longitudinal and cross-sections, benchmarks/temporary benchmarks, setting out, and any other survey works as directed by the Engineer-in-Charge. The survey team with complete equipment shall remain available at the disposal of GMDA for a period of 03 (three) months for planning/field requirements, and the entire work shall be carried out to the entire satisfaction of the Engineer-in-Charge, complete in all respects. Payment shall be released only after submission of detailed survey findings/records to the department, duly signed by the Contractor or his authorised representative and jointly verified/signed by the concerned SDE/JE of the department, complete in all respects and as approved by the Engineer-in-Charge. | 1 | Job |
| 4 | The recovery of MS grill fixed on the footpath has been worked out considering a weight of 19 kg per running meter. As per site condition and approval practice, the recovery quantity has been restricted to 50% of the rate. The cost of the existing grill of the above have been worked out on the basis of theoritical quantities laid on existing site. There shall be no measurement after actual scarifying/ dismantling and no claim of agency on this score will be entertained and full recovery on the basis of quoted rate exhibited in the BOQ shall be made. No rates below reserve price will be considered for all purpose in case the agency quotes lesser than reserve price. The rate shall also include the disposal of waste material. All works upto satisfaction of engineer incharge | 42560 | Kg. |
5 Days Left