Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3812365 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Address Seepage, Leakage Of Toilets, Bathrooms Of Or Living Building No P-751 Of 215 Transit Camp Of Bd Bari Mil Stn Under Ge Kaluchak |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | 22 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 95100.00 |
| Estimated Cost | 4755000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down cement plaster on bricks or stone wall/ decayed surfaces of concrete from roof projection or RCC Chajjas etc. including racking out joints, hacking for key, scrubbing down with water, etc including removing the waste out of defence land all as specified and as directed. | 1660.00 | Sqm |
| 2 | M&L rendering 10 mm thick on fair faces of brick work or concrete surfaces in CM 1:6 finished even and smooth without using extra cement complete all as specified and as directed. | 700.00 | Sqm |
| 3 | M&L Rendering 15 mm thick on fair faces of brick/concrete surfaces in cement plaster 1:4 finished even and smooth without using extra cement, using water proofing compound mix as per manufacturer detail, complete all as specified and as directed. (WPC measured and paid seperately) | 900.00 | Sqm |
| 4 | M&L Rendering 5 mm thick on concrete surfaces in CM 1:3 finished on even and smooth without using extra cement as in ceiling, Chajja etc.complete all as specified and as directed | 60.00 | Sqm |
| 5 | Material & Labour for RCC chajja/fascia/parapet repair by using following steps :- (a) Removal of existing concrete along with loose damaged and cracked concrete/cover concrete from chajjas etc, exposing corroded steel reinforcements upto a depth of 10mm minimum behind the reinforcement by chipping/hacking with chisel and hammer or by mechanical means like chisel hammer, pneumatic chippers including high pressure water jetting to chipped concrete and reinforcement all as directed by Engineer-in-charge. Hard concrete shall not be removed. However if the rebar is corroded, concrete around it shall be removed. (b) Cleaning the surface of reinforcement bars from dust by using wire brushes and dry cloth and applying FOSROC Rebakleens RR- Rust Remover or equivalent using small brush and allow to react it for 16-24 hrs. (c) Providing and applying two coats of Fosroc Nitozinc Primer - two component, zinc rich epoxy, anti-corrosive protective coating or equivalent by brushes to the exposed and cleaned rebars with an interval of 45minutes to 1 hour @ 40microns DFT / coat and allowed to completely dry for 24 hours complete all as specified and directed. | 65.00 | Sqm |
6 Days Left