Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4769117 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Building No. T 22 And T 40 Against Job No W/sr (bldg)10 Khreuh 2025-26, Provn Of Conference Room Against Job No W Rw 02 Khreuh 2025 26 And Provn Of One Bathing Point Against Job No W Rw-03 Khreuh 2025-26 Under Age B R-iii Of Ge 861 Ews |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 48200.00 |
| Estimated Cost | 2408000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in Hard/Dense soil complete all as specified and as directed by Engineer-in-Charge. | 44.00 | Sqm |
| 2 | Excavating in trenches, not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, cable, pipes etc. not exceeding 10 sqm on plan and not exceeding 1.5 mtr in depth and getting out in any type of soil complete all as specified and as directed by Engineer-in- charge. | 61.04 | Cum |
| 3 | Removing excavated material/soils to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point, complete all as spefied and as directed by Engineer-in-Charge. | 25.84 | Cum |
| 4 | Material & Labour PCC 1:5:10 type D2 using 40 mm graded stone aggregates in foundation , filling and mass concrete complete all as specified and directed by Engineer-in charge. | 1.20 | Cum |
| 5 | Material & Labour for Reinforced cement concrete (Design Mix) M-25 as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed by Engineer-in-Charge. NOTE :- Form work and Steel reinforcement shall be measured and paid seperately under appropriate items of Schedule 'A' BoQ.seperate items. | 2.30 | Cum |
6 Days Left