| Tender ID | 3798674 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To External Plaster And Valley Gutter And Connected B/r Works In Building No P-838, P-839 And P-840 At Vayu Vihar Brookshabad Af Stn And Provision Of Qty 04 Air Conditioner Of 2.0 Ton Capacity For Choc And Server Room At Hq Afc Sri Vijaya |
| Last Date For Submission | 13th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 58000.00 |
| Estimated Cost | 2899000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down cement plaster of any description incl raking out joints, hacking for key, scrubbing down with water, etc all as specified and as directed by Engineer-in-Charge. | 1270.00 | Sqm |
| 2 | Materials and labour for rendering 5mm thick in CM 1:4 mixed with water proofing compound over and including 10mm thick plastering in CM 1:6 on external surfaces of block masontry and finishing the surfaces even and smooth without using extra cement, complete all as specificed and as per directed by Engineer-in-Charge. Note: supply only WPC shall be measured and paid seperately | 1270.00 | Sqm |
| 3 | Supply only Liquid water proofing compound (200ml for 50kg Bag of Cement ) of make Dr. Fixit Pidiproof LW+ or equivalent | 21.64 | Ltr |
| 4 | M&L for preparation of newly plastered surface of walls and applying two coat of weather proof anti fungal paint (Apex - ultima) on walls over a coat of primer and a coat of external wall putty all as per manufacturer instruction including necessary scaffolding complete all as specified and as directed by Engineer-in-Charge. | 1270.00 | Sqm |
| 5 | M&L for complete removal of existing treatment on old external surfaces of walls, Facias, cornices etc and applying two coat of weather proof anti fungal paint (Apex - ultima) on walls over a coat of primer (Selo-Prime) and a coat of external wall putty all as per manufacturer instruction including necessary scaffolding complete all as specified and as directed by Engineer-in-Charge. | 3810.00 | Sqm |