Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4484458 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Road And Connected Works At Rocket Regt Of Sukna Mil Stn Under Ge Sukna |
| Last Date For Submission | 30th Jun, 2026 |
| Opening Date | 01 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 83500.00 |
| Estimated Cost | 4175000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area n. exc. 400 sq.m. exc 50 mm and n exc 100mm deep Complete all as specified and as directed. | 83.00 | X Sqm |
| 2 | M&L 7.5 cm thick (Compacted thickness) WBM with granite, trap of blast, with coarse etc aggregates of grading 2 (63 to 40mm size) or grading 3 (50 to 20 mm size), spread, rolled and consolidated to gradient and camber required using 8-12 tonne power road roller, complete all as specified and directed. | 3.00 | X Sqm |
| 3 | M&L for preparing unsurfaced / new water bound macadam(WBM) surfaces by brushing with Wire Brushes for removing Caked, Mud, etc., Sweeping with Brooms and finally Fanning the Cleaned Surface with Gunny Bags to remove all loose dirts, etc. and Applying evenly a prime coat of Cationic Bitumen Emulsion SS1 confirming to IS: 8887 @ 0. 70-1.0 kg/sqm on surface o WMMIVVBM as specified in Table 500-3 of MoRTH specification for road and bridge works 2013, using mechanical sprayer after cleaning surface complete all as specified and directed . | 83.00 | X Sqm |
| 4 | M&L for premix bituminous macadam using paving bitumen of grade 30 Pack (VG-30) @ 4% by weight of total mix laid / rolled and compacted to required gradient and camber (condolidated theknis 50 mm or less) with 8 to12 tonne power road roller and rolled to a uniform smooth surface (consolidated thickness 50 mm or less), complete all as specified and as directed. Note: The contractor's quoted rate shall be also be deemed to include the following elements: (i) The contractor shall get the mix design done through Govt approved Lab and the same shall be got approved from the bitumen content from the GE before providing Bituminous Mecadum. (ii) In case of varition in bitumen content as per approved design mix in comparision with the bitumen content as specified above, the varition in quantity of bitumen shall be adjusted @ Rs 42 per Kg. | 41.50 | Cum |
| 5 | M&L for preparing existing black top road surface by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and Applying evenly a priming/tack coat of Cationic Bitumen Emulsion (RS-1) conforming to IS: 8887 at a rate of application of 0.2-0.3 kg/sqm on buminous surface as specified in Table 500-5 of MaRTH specification for road and bridge works 2013, using mechanica sprayer after cleaning of existing surface as specified and directed | 633.00 | X Sqm |
6 Days Left