Tendering Authority: Water Resources Department
Tender ID3997557
Organisation NameWater Resources Department
Tender BriefCorrigendum : Stabilization To The Right Bank Of Nallah On Upstream Side Of Ghano Bandhara At Parampai In Marcaim Constituency. (3rd Call)
Last Date For Submission1st May, 2026
Opening Date04 May, 2026
Cost
Document Cost3000.00
EMD47459.00
Estimated Cost2372938.00
Location
CityMulti city
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation by mechanical/manual means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted incl. chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring and bracing, removal of stump and other deleterious matter, dresing of sides and bottom and backfilling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge.310.50Cum
2Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.13.80Cum
3Supplying jamba wooden bally piles 150mm mean diameter cut to a length required (not exceeding 9 metres ) and planted in position ready for driving: a)Upto 2.50m long pile375.00R.M.
4Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured) a)Upto 2.50m long pile330.00R.M.
5Centering and shuttering including struttings, propping etc. and removal of formwork for a)Foundations, footings, bases for columns and mass concrete. 270.00Sq.m