| Tender ID | 3939728 |
|---|---|
| Organisation Name | Urban Improvement Trust |
| Tender Brief | Corrigendum : Widening And Strengthening Of Bt Road From Gulab Circle To Over Bridge Balotra |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 19 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 2989880.00 |
| Estimated Cost | 149494000.00 |
| City | Multi city |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART A | ||
| 2 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) By Mechanical Means In area of light jungle | 4.46 | Hect. |
| 3 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 26353.55 | Cum |
| 4 | Detail survey of site with total station including plane table survey of builtup area showing road level, boundary walls, electric poles, adjacent building / plot details, set back, other existing structures ( temporary or permanent ), sewer lines & septic tank, main plumbing lines, nalahs or drains water bodies/water logging areas as may be required depending upon the site conditions/ topography of the area including printout on required size paper in three copies & one soft copy of approved media | 12.24 | Hect |
| 5 | Dismantling kerb stone channels by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per MoRTH Specification Clause 202. | 4000.00 | Rmt |