Tendering Authority: Military Engineer Services
Tender ID4080662
Organisation NameMilitary Engineer Services
Tender BriefCwek/token-154/864 Ews/2025-26 Spl Repairs/ Renewal Of Various Capacity Distribution Transformers Against Ber In Zone A Alongwith Connnected Accessories In The Aor Of Age E/m Under Ge 864 Ews (job No W/spl Repairs (e/m)-07/bb Cantt/2025-26)
Last Date For Submission20th May, 2026
Opening Date28 May, 2026
Cost
Document Cost1000.00
EMD103000.00
Estimated Cost5200000.00
Location
CityMulti city
StateMulti State

Register to see full details

BOQ Items
#ItemQtyUnits
1Dismantling of existing distribution Transformer fixed in 2 pole/4 pole / in plinth mounted from site with the help of crane and manpower after taking proper shut down and deposited in safe custody of MES complete all as specified and directed.5.00Each Job
2Supply, Installation, testing and commissioning copper wound step down transformer, Indoor type complete with standard fittings, HT, 11 KV, 3 Phase, LT, 433 Volts, 3 phase 4 wire with off load tapings on Primary side to vary secondary voltage + 7.5% with tapings at every 2.5% rating of capacity 500 KVA including bushing on HT side and LT side all as per IS 1180 complete including repairing of existing plinth as per direction by Engineer in charge complete all as specified and directed.1.00Each
3Supply, Installation, testing and commissioning copper wound step down transformer ,Outdoor type complete with standard fittings, HT, 11 KV, 3 Phase, LT , 433 Volts, 3 phase 4 wire with off load tapings on Primary side to vary secondary voltage + 7.5% with tapings at every 2.5% rating of capacity 400 KVA including bushing on HT side and LT side all as per IS 1180 complete all as specified and directed.1.00Each
4Supply, installation, testing and commissioning copper wound step down transformer ,Outdoor type complete with standard fittings, HT, 11 KV, 3 Phase, LT , 433 Volts, 3 phase 4 wire with off load tapings on Primary side to vary secondary voltage + 7.5% with tapings at every 2.5% rating of capacity 315 KVA including bushing on HT side and LT side all as per IS 1180 complete all as specified and directed.1.00Each
5Supply, installation, testing and commissioning copper wound step down transformer ,Outdoor type complete with standard fittings, HT, 11 KV, 3 Phase, LT , 433 Volts, 3 phase 4 wire with off load tapings on Primary side to vary secondary voltage + 7.5% with tapings at every 2.5% rating of capacity 100 KVA including bushing on HT side and LT side all as per IS 1180 complete all as specified and directed.1.00Each