Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4860498 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Development Of Inland Water Transport On Gomati River In Tripura Sh Construction Of Stair Case And Bank Protection Work In 6 Six Nos Locations Of Floating Terminals Along The Bank Of Gomati River Locations 01 No At Uttar Maharani 02 Nos At Chabimu |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 20 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 90510.00 |
| Estimated Cost | 4525479.00 |
| City | Multi city |
|---|---|
| State | Tripura |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | ANNEXURE-I (At Chobimura) With dewatering. Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50m, dressing of sides & bottom and back filling in trenches with excavated suitable material. i) Ordinary Soil. a) Upto 3.00 metre depth. | 88.550 | cum |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 8.550 | cum |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.All kinds of soil. | 95.033 | cum |
| 4 | Providing & laying in position cement concrete of specified grade excluding the cost of centring & shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 40 mm nominal size) | 8.550 | cum |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement. -All work upto plinth level :a) 1:1 :3 ( 1 Cement : 1 fine sand : 3 graded stone aggregate 20 mm nominal size) | 21.625 | cum |
13 Days Left