Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4829763 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Estimate For Renovation Of 06 Nos Parks Near H.no. - 1387,1376,1496, 1494c, 786 And Near Yoga Center In Sector-15 Part-ii, Ward No.- 13, Zone-iii, Gurugram. Recall |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 15000.00 |
|---|---|
| EMD | 242000.00 |
| Estimated Cost | 12050178.00 |
| City | Multi city |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Bridge Ladder: 10 L x 2 W x 6 H. Horizontal ladder is of m.s pipe 2 and and vertical ladder is of same material of 12 gauge ISI mark with suitable PU Primer and PU Paints. Complete item with GST, Transportation, Installation with C.C and labor at site. | $1.000 | Nos. |
| 2 | Providing and fixing Chain Swing - 2 seater ( Swing). Specifications Attached. | $1.000 | Nos. |
| 3 | sea saw 4 seater 8 lx5 5 Hw X 15 high frame of ms pipe 2 x 12 guage sittibg planks is of pipes and handle seats 4 nos. molded frp material | $1.000 | Nos. |
| 4 | Wave Slide: 9 .5 L x 5 H. Wave slide is of molded Fiberglass Reinforced Plastic (FRP) of 6mm thick and climbing ladder is of m.s pipe 1 x 12 gauge and m.s rectangular pipe | $1.000 | Nos. |
| 5 | -Multi Play Spiral-N-Tunnel Station Item code: ME-03 Covering Area: 30 L x 20 W It contains: FRP Spiral Slide 6mm thick inclined at 5 H 1 no FRP Tube Slide inclined at 5 H 1 no FRP Wave slide 6mm thick inclined at 5`H - 1 no FRP Bowl slide 6mm thick with FRP Entry Gate inclined at 3 H 1 no FRP Stair 3mm thick inclined at 3 H- 1 no FRP Platform Hex. Shape 5mm thick in 7 Dia 2 no. FRP Canopy 2 no. FRP Deer Figure on canopy 2 no. FRP Fancy Railing Frog and Monkey Shape 4 no. FRP Walking Bridge 7.5 Long 1 no. M.S Spring Climber 1 no. M.S Zig-Zag Climber 1 no M.S Chain Net Climber 1 no M.S Climbing Ladder 1 no M.S Station in which vertical m.s pipe is of 3 x12G of I.S.I Mark 2 no Including Trans portion and Fixing and all type of taxes . | $1.000 | Each |
9 Days Left