| Tender ID | 3888096 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Fixing Of New Grill Barricade On Vacant Drain Wall Of Mswc-ii At Gandarpur Entrance Point In Ward No.47. |
| Last Date For Submission | 8th Apr, 2026 |
| Opening Date | 10 Apr, 2026 |
| Document Cost | 2360.00 |
|---|---|
| EMD | 3900.00 |
| Estimated Cost | 380717.00 |
| City | Multi city |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling and removing R.C.C.columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead as directed. | 0.10 | cum |
| 2 | Supplying and stransporting and fitting and fixing M.S. Angle Frame Grill made with different size M.S. Angle and M.S. Flat as per design and well welding & grinding both side and stacking at work side including transporting from work shop to site as per specification and direction of Engineer in Charge. | 2329.60 | Kg |
| 3 | Supplying and transporting fitting and fixing 6gage BRC fabric Wire Mess as per specification and direction of Engineer in Charge.(Materials Item No-143) | 145.60 | sqm |
| 4 | Re-fixing of New Grill grills with lifting of cranes after desilting work is over etc complete as per the direction of Engineer in charge. | 6.00 | Hr |
| 5 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2 to ) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | 2.14 | cum |