Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4712511 |
|---|---|
| Organisation Name | Rail Wheel Factory |
| Tender Brief | Impeller And Shaft Assembly For Draw Furnace In Wheel Shop As Per Rwf Drg No. 702 2105 10800. Note: (1). Item Shall Be Supplied In Assembled Condition. (2). Material Test Certificate From Nabl Accredited Laboratory Shall Follw The Supply. (3). The Supply Shall Be Accompanied With A Dynamic Balancing Certificate. (4). Performance Test As Per Is 4894 Has To Be Done And Test Certificate Shall Be Provided Aling With Supply. (5). The Supplies Shall Be Guaranteed For Workmanship, Quality And Performance For A Minimum Period Of 12 Months From The Date Of Fitment Or 18 Months From The Date Of Supply Whichever Is Earlier. Any Failure During This Period Shall Be On Free Replacement. (6). The Impeller Should Be Suitably Packed To Avoid Damage During Transit. (7). The Tenderer Shall Be A Reputed Blower Manufacturer And Shall Furnish Documentary Evidence For Being In The Field Of Manufacturing Blower. (8). Documentary Evidence For At Least Two Recent Supplies Should Be Furnished. (9). The Drawing Is For General Guidance Only And The Supplier Shall Ensure That The Capacity Of The Fan Mentioned In The Drawing Is Achieved. [ Warranty Period: 18 Months After Thedate Of Delivery ] |
| Last Date For Submission | 10th Jul, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Multi State |
17 Days Left