| Tender ID | 4029715 |
|---|---|
| Organisation Name | Housing And Urban Development Department |
| Tender Brief | Improvement/ Upgradation Of Link Road From Lane No. 4 To Khan Colony Firdousabad Batmaloo Bwo 75 Mm Wmm, 50mm Bd, 25mm Sd And 06 Mm Seal Coat |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 1100.00 |
|---|---|
| EMD | 100000.00 |
| Estimated Cost | 5000000.00 |
| City | Multi city |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 15 | No. |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 1385.04 | Sqm |
| 3 | Providing, Laying, Spreading & Compacting graded stone aggregate (size range 53mm to 0.075mm) to wet mix macadam (WMM) specifications including mixing the material with water at OMC mechanical mixer plant carriage of mixed material by Tipper at site with all leads and lifts laying in uniform layers in sub base/ base course on a well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density complete as per technical specification of clause 406.(75mm thick compacted). | 358.2 | Cum |
| 4 | Providing and applying tack coat using hot straight run bitumen of VG 10 grade including heating the bitumen and spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc and finally brooming the surface as per required specification. (Including cost & carriage of all materials involved upto site of work complete). | ||
| 5 | On WBM surface using tar @0.75kg/sqm. | 4776 | Sqm |