Tendering Authority: Municipal Council
Tender ID4078734
Organisation NameMunicipal Council
Tender BriefImprovement Work In Education Wing Under 2025-26 Sh Water Proofing Of Atal Adarsh Vidyalaya Havlock Square Under Education Wing
Last Date For Submission30th Apr, 2026
Opening Date30 Apr, 2026
Cost
Document Cost0.00
EMD33371.00
Estimated Cost1668568.00
Location
CityMulti city
StateDelhi

Register to see full details

BOQ Items
#ItemQtyUnits
1Removing of solar panel on the top terrace of school to clearing the site for making water proofing treatment of school terrace and again re-installation ( including cement concrete base demolishing and re- construction) in existing working condition on the top of terrace in the supervision of electrical department NDMC nothing extra shall be paid to the agency at any cost if any damaged / happend during the handling process to removal and reinstallation then agency will be bear at his on cost, the safety of electric panel at the time of removal to re-installation is on the part of agency. Complete as per entire direction and satisfaction of Engineer- in- Charge.30.00Square Metre
2Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix)4.50Cubic Metre
3Removing of MS Grill on PVC water tank on terrace to make proper space for water proofing treatment of school terrace and again reinstallation after water profing treatment and fixing of PVC water tank in positionon terrace including all tools and plants. Nothing extra shall be paid to the agency , complete in all respect as per entire direction and satisfaction of Engineer- in -charge.10.00Job
4Disconnecting/Uninstallation PVC water storage tank on terrace of any size from water supply line to make proper space for water proofing treatment and re-installation/connecting from water supply line after water proofing treatment on terrace including all tools and plants with required fittings. Nothing extra shall be paid to the agency and complete in all respect as per entire direction and satisfaction of Engineer- in -charge.12.00Job
5Dismantling 15 to 40 mm dia G.I. pipe including stacking of dismantled pipes (within 50 metres lead) as per direction of Engineer-in-Charge. (a) Internal Work- Exposed on wall78.00Metre