Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4465156 |
|---|---|
| Organisation Name | Kolkata Municipal Corporation |
| Tender Brief | Laying Work Of Paver Blocks From 108a, K N Sen Road To 129/2 Swinhoe Lane And 93f Swinhoe Lane In Ward 67 |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 10000.00 |
| Estimated Cost | 497784.00 |
| City | Multi city |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 11.5374375 | %M3 |
| 2 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 53.6625 | SQM |
| 3 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 3.4880625 | M3 |
| 4 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with Concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CL.No.3.3 of IS: 15658) as per Table 2 of IS :15658 with flexural strength/breaking load as per Annexure G of IS:15658.on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clanse 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will he us per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 af IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 50mm thick i) Grey (12th Corrigenda & addenda dated14.10.2020) | 357.75 | SQM |
| 5 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 35 | EA |
8 Days Left