Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3888339 |
|---|---|
| Organisation Name | New Mangalore Port Trust |
| Tender Brief | Modification In The First Floor Of The Existing Rest Room Inside Fire Fighting Pump House No.1, Construction Of Covered Shed Near Pump House No 1 And Near Control Tower Building At Jetty 10 At Oil Jetty Area, Nmpa |
| Last Date For Submission | 21st Apr, 2026 |
| Opening Date | 22 Apr, 2026 |
| Document Cost | 560.00 |
|---|---|
| EMD | 37700.00 |
| Estimated Cost | 1594985.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Description | ||
| 2 | Modification in the first floor of the existing Rest Room in side Fire Fighting Pump House No.1 | ||
| 3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates | 1.25 | Cum |
| 4 | Dismantling of existing structures comprising of steel work in all type of sections upto a height of 5 m above plinth level including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and transportation andstacking serviceable material in Stack yard with all lifts complete as per specification. | 20.00 | Kg |
| 5 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications | 4.00 | Cum |
20 Days Left