Tendering Authority: Himachal Pradesh Irrigation And Public Health Department
Tender ID3888133
Organisation NameHimachal Pradesh Irrigation And Public Health Department
Tender BriefO Rcc Intake Chamber 2 Nos, Co Wire Crate, Co Rcc Retaining Wall Near Pump House Naglai, Co Anchor Block 1 Nos. Providing, Laying, Jointing And Testing Of Gi Api Pipe At Various Rds
Last Date For Submission9th Apr, 2026
Opening Date10 Apr, 2026
Cost
Document Cost2000.00
EMD59860.00
Estimated Cost2992995.00
Location
CityMulti city
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in foundations trenches etc. (for pipes and pits ) upto all depths in all kinds of soil such as pick work,jumper work, blasting and chiselling soft/hard rocks where blasting is prohibited in all leads and lifts including trimming and dressing of sides levelling of bed to correct excavation and returning the stacked soil after laying jointing and testing of G.I.Pipes/ API etc in trenches in 15 cm. layers including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting/timbering and dewatering where ever required including restoration of un-metalled/metalled paved surface of its original conditions including cost of diversion for traffic night signals fixing caution Boards and fencing etc.complete in all respects.185.42Cum
2Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) excluding cost of centring & shuttering in foundation and plinth.1.57Cum
3Providing and laying cement concrete 1:1 :3 (1 cement: 1 sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in.
4Foundation, footing bases of columns and the like and mass concrete in all leads and lifts.1.02Cum
5Walls (any thickness but not less than 0.1m) including attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level)6.61Cum