Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4073902 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | P/l Patch Work Maintenance Of Drain Trimming Of Grass, Whti Washing Etc In Km. 0/00 To 1/200 And Terminal Building At Kalyani Helipad |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 27 Apr, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 6600.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | White washing two coats on parapets wall and tree trunks including preparation of surface by cleaning scraping etc. as per technical specification clause 1915 including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge. | 464.000 | Per Square Meter |
| 2 | Mainteance of drain including erosion, reoair, cleaning, reshaping, regarding , deepening of side drain as well as per Technical specification Clause 1907 including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge. | 1200.000 | Per Running Meter |
| 3 | Trimming of grass and weeds from the shoulders/ berms and disposing off the same to suitable locations as per technical specifications Clause 1914 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | 3600.000 | Per Square Meter |
| 4 | Finishing wall with weather proof exterior grade emulsion of approved design (Apexultima) or its equarlied on undecorated wall surfaces (One or more coats) to give an even shade and final finish after throughly cleaning the surface to remove all dirt, dust and other foreign matter etc including sand paper smooth including carriage of materials in all leads as per directions of the Engineer-in-Charge. | 627.000 | Per Square Meter |
| 5 | Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | 627.000 | Per Square Metre |
3 Days Left