Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4077041
Organisation NamePublic Works Department
Tender BriefPeriodical Renewal On Dinger Kinner Bhagyanghat Road Km 0/0 To 9/0 (sh- Providing And Laying Wbm G-iii, Bituminous Macadam 50 Mm Thick And Thermoplastic Compounds In Km 0/0 To 9/0, Bitumineous Macadam 30 Mm Thick In Km 0/0 To 8/0 And Using Plastic W
Last Date For Submission28th Apr, 2026
Opening Date28 Apr, 2026
Cost
Document Cost5000.00
EMD257000.00
Estimated Cost0.00
Location
CityMulti city
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing Laying,spreading and compacting stone aggregate of specific sizes to water bound macadam specifcation including spreading in uniform thickness, hand packing rolling with 3-wheeled static roller 8-10 tonnes in stages to proper grade and camber applying and brooming crushable screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per techical specification clause 405 . W B M Grade-III 53 mm to 22.4 mm size with all leads and lift and as per the direction of Engineer -in-Charge21.62Per Cubic Metre
2Providing and applying primer coat with Bitumen emulsion (SS-I) grade on the prepared surface of granular base including cleaning of road surface and spraying primer @ 0.70-1.00 kg / sqm using mechanical means as per technical specification clause 502. with all leads and lift and as per the direction of Engineer -in-Charge288.23Per sqaure metre
3Providing and applying tack coat with bitumen emulsion ( RS-1) using emulsion distributor @ 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer and cleaned with hydraulic broom as per Technical specification Clause 503 with all leads and lift and as per the direction of Engineer -in-Charge28827.56Per sqaure metre
4Providing and laying bituminous concrete 30mm thick with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects with all leads and lift and as per the direction of Engineer -in-Charge738.60Per Cubic Metre
5Providing and laying 30mm thick bituminous concrete using plastic waste with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects137.25Per Cubic Metre
28th Apr, 2026

4 Days Left

WhatsApp