Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3888203 |
|---|---|
| Organisation Name | IREL India Limited |
| Tender Brief | Providing Rcc Pipe For Drain South Of 60 T Weigh Bridge Raw Sand Stock Area |
| Last Date For Submission | 7th Apr, 2026 |
| Opening Date | 08 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 1051351.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing concrete in cement mortar and clearing away the debris with in a distance of 150 m etc complete standard specifications and as directed by the Engineer-in-Charge | 35.000 | CuM |
| 2 | Earthwork excavation in hard soil, or any class of soil for laying RCCpipe drain/chambers in correct alignment and sloped levels, including depositing the excavated earth on the bank with an initial lead of up to 50 meters and a lift of up to 1.50 meters. The work includes breaking clods, watering, ramming, and sectioning of the spoil bank, as well as refilling after laying the drain/chambers, all in accordance with standard specifications and as directed by the Engineer-in-Charge. | 235.000 | CuM |
| 3 | Supplying, laying, and jointing 1200 mm inner diameter RCC NP4 pipes (2.50 m length, 12.00cm wall thickness) without collars for drainage, including jointing with cement mortar and hemp in correct alignment and level. The work includes the cost and conveyance of materials, loading, unloading, handling, and laying using mechanical machinery such as Hitachi/JCB. It also covers all labor charges, hire charges for tools and equipment, and all incidental works required for completion as per standard specifications and as directed by the Engineer-in-Charge. | 20.000 | Each |
| 4 | Supplying & Placing RMC M-35 mix using 20mm hard broken stone for RCC Roads etc including all cost and conveyance of RMC with admixtures, hire charges for concrete motor pumps and boom placers, shuttering materials, all labour charges, watering,curing etc complete as per standard specification but excluding cost of MS reinforcement. (Concrete should be compacted with mechanical/electric vibrator) | 5.500 | CuM |
| 5 | Sundry & Petty works such miscellaneous items. Heavy Mazdoor | 10.000 | Each |
6 Days Left