Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4035735 |
|---|---|
| Organisation Name | IREL India Limited |
| Tender Brief | Renovation Of Ancillary Buildings And Dispensary Buildings At Irel (india) Limited, Chavara Plant. |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 64208.00 |
| Estimated Cost | 3788272.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of wall, masonry wor of PCC floor/ Rcc slab/ brick/laterite/rubble in cement mortar including disposal of debris within a distance of 150 M etc complete as per standard specification. | 6.000 | Cu.M |
| 2 | Dismantling and removing existing wall/floor tiles and Floor plastering for toilet including all cost and all labour charges, hire charges for tools and plants, disposing waste materials within a distance of 150 M etc complete as per standard specification. | 250.000 | Sq.M |
| 3 | PCC 1:5:10 using 40mm hard broken stone for bed concrete etc including all cost and conveyance of all materials, loading & unloading charges, hire charges for shuttering and labour charges, curing etc complete as per standard specification but excluding cost of cement. | 5.000 | Cu.M |
| 4 | Cement block Masonry using good cement blocks for foundation and super stretchers in cement mortar 1:6 using good quality cement block at all heights and levels etc includes cost and conveyance of all materials, all labour charges hire charges for tools and plants, scaffolding, loading-unloading charges, etc complete as per standard specification but excluding cost of cement. | 4.000 | Cu.M |
| 5 | Plastering with cm 1:4,15 mm thick one coat at all heights and levels floated hard and trowelled smooth including all cost and conveyance of materials and all labour charges for providing necessary scaffolding ,watering and curing hire charges for tools and plants, scaffolding etc complete as per standard specification but excluding cost of cement. | 50.000 | Sq.M |
5 Days Left