Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: IREL India Limited
Tender ID4031418
Organisation NameIREL India Limited
Tender BriefRenovation Of Floors, Drains And Rcc Walls At The Hup Double Deck Screen Area, Along With Trench Laying For Protection Of Pipelines From Hup To Mag And Non Mag Godowns At The Irel Chavara Plant.
Last Date For Submission7th May, 2026
Opening Date08 May, 2026
Cost
Document Cost0.00
EMD56351.00
Estimated Cost3324698.00
Location
CityMulti city
StateMulti State

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work excavation in hard soil for RCC Road in existing metal /WB road and depositing on bank with initial lead up to 300M and lift up to 1.50M including breaking clods, watering, ramming, and sectioning of spoil bank etc complete.116.600CUM
2Cement concrete 1:5:10 using 40mm or 20mm hard broken stone for floor base concrete including all cost & conveyance of all materials, all labour charges, for earth work boxing,mixing, placing ,ramming ,curing ,loading/unloading charges and all hire charges for shuttering materials,tools and plants ,mixing machine etc complete as per standard specification but excluding cost of cement.23.300CUM
3Supplying & Placing RMC M-35 ( cement 420kg/M3)mix using 20mm and lesser size hard broken stone for RCC Roads etc including all cost and conveyance of RMC with admixtures, hire charges hire charges for concrete motor pumps and boom placers, shuttering materials, all labour charges, watering,curing etc complete as per standard specification but excluding cost of MS reinforcement including cost of cement. (Concrete should be compacted with mechanical/electrical vibrator)85.500CUM
4Reinforced Cement concrete M20 ( 1:1.5:3) cement confor wall, buttress, raft, beams, columns etc by using 20mm & down graded stone aggregate including all cost & conveyance of materials, loading & un loading charges, hire & labour charges for shuttering/form work, labour charges for mixing, laying, ramming, watering & curing,etc.at all heights and levels but excluding cost of cement & M.S bar etc complete as per standard specification (Concrete should be mixed with mixer machine compacted with mechanical vibrator)86.000CUM
5Cement block masonry using good cement blocks for foundation , super structures,walls in cement mortar 1:6 using good quality cement block at all heights and levels etc including cost and conveyance of all materials,all labour charges hire charges for tools and plants,scaffolding ,loading-unloading charges,etc complete as per standard specification but excluding cost of cement.1.300CUM
7th May, 2026