Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3888074 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Repair And Renovation Of Toilet At Machua Bazar In Ward No 34 . |
| Last Date For Submission | 8th Apr, 2026 |
| Opening Date | 10 Apr, 2026 |
| Document Cost | 7080.00 |
|---|---|
| EMD | 37500.00 |
| Estimated Cost | 3740325.00 |
| City | Multi city |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer in charge. | 111.72 | Cum |
| 2 | Supply and filling in foundation and plinth with river sand, in layers including watering, with cost, conveyance, royalties, and taxes of all materials, cost of all labour, carriage of water, sundries T & p required for the work etc all complete as per the specification & direction of E-I-C. | 55.51 | Cum |
| 3 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete as per the specification & direction of E-I-C. | 26.76 | Cum |
| 4 | R.C.C. work of M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position. Base & Footing | 3.69 | Cum |
| 5 | Grade Beam | 6.70 | Cum |
7 Days Left