Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4857039
Organisation NamePublic Works Department
Tender BriefRestoration Of Damages On Shahpur Sihunta Chowari Road Km 0/0 To 53/00
Last Date For Submission13th Jul, 2026
Opening Date13 Jul, 2026
Cost
Document Cost2000.00
EMD170478.00
Estimated Cost8523900.00
Location
CityMulti city
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing and installation of self drilling hollow soil/ rock anchors (SDA) made of 40 (Forty) CR material with outer dia of 38 mm(Thirty Eight Millimeter) and inner dia 19 mm (Ninteen Millimeter) having minimum 6.00 (six) metres length & yield load carrying capacity of minimum 400 KN(Four Hundered KN) in soil/over burdon/ rocks suitable for drilling placing including cement grouting & installation with all accessories such as sacrificial drill bit 76 mm(Seventy Six millimetre) dia, couplers, 10 mm(Ten millimetre ) thick base plate of size 200mm x200 mm (two hundred millimetre into two hundred millimetre), nut and bolt complete in all respect and as per direction of Engineer-In-Charge. Including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government.1320.00Per Running Metre
2Providing DT mesh (high tensile strength rockfall netting) 250 mm x 250 mm (two hundred fifty milimeter in to two hundred fifty milimeter ) rectangular or rhomboidal shape for protection from rockfall including all equipments and T&P with in all leads and lifts and as directed by the Engineer -in -charge Any loss to the public /private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases . The rate including octroi , royality , malkhana , toll tax , GST or any other taxes imposed by the Government .440.00Per Square Metre
3Providing and fixing 3D net including all cost of labour, material and T&P required for proper completion of work (3D net is a light weight three dimensional turf reinforcement mat (TRM) made of continuous monofilaments used at their intersections made of polyamide (nylon) filaments thermally fused at their intersections to create a homogeneous matrix with minimum tensile strength KN/m thickness7.50-10 mm (Seven decimal five zero milimeter to ten milimeter) , mass /unit area 220-270 (Two hundred twenty to Two hundred seventy milimeter) gm per sqm with in all leads and lifts and as directed by Engineer in Charge. Any loss to the public /private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases . The rate including octroi , royality , malkhana , toll tax , GST or any other taxes imposed by the Government .440.00Per Square Metre
4Hydroseeding of soil slopes including mixing of seeds, mulch( meeting performance parameters as mentioned in tchnical specifications of sections-6),fertilizer and sil amendment products if required in hydroseeder machine with water and spraying the mixture with 100 (hundred) psi pressure pump on hilly slopes exposed soils( end product must form a blanket with in two hours of application) including maintenance for 3 (three) months watering 2-3 (two to three ) times a day after 24 (Twenty four) hours of hydroseeding) till propagation of grasses and shrubs with in all leads and lifts and as directed by Engineer in Charge. Any loss to the public /private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases . The rate including octroi , royality , malkhana , toll tax , GST or any other taxes imposed by the Government ..440.00Per Square Metre
5Surface dressing of the ground including removing vegetation and inequalities on the slope and disposal of rubbish material upto any lead and liftor as directed by the Engineer-in-Charge including carriage of material with in all leads, lifts and other incidental. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases. The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government.440.00Per Square Metre
13th Jul, 2026

6 Days Left

WhatsApp