| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (thirty centimeter) in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m (fifty meter) and lift upto 1.5 m, as directed by Engineer-in-charge. ordinary rock including carriage of material with in all leads and lifts and other incidentals as per direction of Engineer-in-Charge.The rates includes octroi,royality ,Malkana toll tax goods and serivice tax ,building and other construction work, welfare cess, royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 39.52 | cubic metre |
| 2 | Providing reinforced concrete in sub-structure complete as per drawings and technical specifications clause 802,804,805,806,807,1202 & 1204 .P.C.C. grade M-15 (i) Nominal mix 1:2:5:5)(One Cement two and half sand five graded stone aggregate 40 mm nominal size including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 47.02 | Cubic Metre |
| 3 | Supplying, fitting and placing HYSD bar reinforcement (Fe-415) in Sub--Structure complete as per drawings and Technical Specifications Clause 1002,1005,1010 and 1202 including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other construction worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 196.04 | Kilogram |
| 4 | Providing and erecting a "W" metal beam crash barrier comprising of 3mm (Three milimeter) thick corrugated sheet metal beam rail, 70cm. above road/ground level, fixed on ISMC series channel vertical post, 150x75x5mm spaced 2 metre centre to centre , 1.8 metre high 1.1 metre below ground/road level all steel parts and fitments to be galvanised by hot dip process all fitting to conform to IS: 1367 and IS 1364, metal beam rail to be fixed on the vertical post with space of channel section, 150x75x5mm, 330mm long complete as per clause,810. including welding for jointing and fixing of crash barrier for their safety and stability.including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 30.00 | Metre |
| 5 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering as per drawing and technical specification in C.C 1:3:6 (one Cement : Three coarse sand : Six graded stone aggregate 40 mm (Forty millimeter) nominal size) including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess, royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 16.20 | Cubic metre |