Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3888152 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Restoration Of Rain Damages On Thural To Bachhwai Road Km. 0/0 To 6/195 |
| Last Date For Submission | 6th Apr, 2026 |
| Opening Date | 06 Apr, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 4000.00 |
| Estimated Cost | 199375.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation for foundation of structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks ( Where blasting is prohibited) as per drawings and M.O.R.D. technical specification section 300 and 1600 as per direction of the Engineer- In Charge including setting out, shoring and bracing , removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty millimeter) compacted thickness of each layers including shoring and strutting and pumping and bailing out water (surface and sub soil water ) upto any depth and any quantum of water including cleaning of slush which may arrise out during dewatering as per entire the satisfaction and the direction of Engineer-in-Charge. Including carriage of materials within all leads, lifts and other incidental . The rate is including octrai, royality, Malkana. toll tax, sale tax, GST or other taxes imposed by the Government. | 27.50 | Per Cubic metre |
| 2 | Providing and laying of boulder apron laid in wire crates with 4mm (Four millimetre) dia GI wire conforming to IS:280 and IS:4826 in 100mm x100mm (Hundred millimetre into hundred millimetre) mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone bounders weighing not less than 25 Kg (Twenty five kilogram) each as per drawing and technical specification clause 1301 as per entire the satisfaction and the direction of Engineer-in-Charge. Including carriage of materials within all leads, lifts and other incidental . The rate is including octrai, royality, Malkana. toll tax, sale tax, GST or other taxes imposed by the Government. | 68.75 | Per Cubic metre |
5 Days Left