Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Himachal Pradesh Irrigation And Public Health Department
Tender ID4078668
Organisation NameHimachal Pradesh Irrigation And Public Health Department
Tender BriefRestoration Of Rain Damages To Source Level Augmentation Of Various Lwss Schemes Under Jal Shakti Division Ghumarwin In Ghumarwin Distt. Bilaspur Sh Construction of Thrust Anchor Block At Various Location Under Pdna
Last Date For Submission29th Apr, 2026
Opening Date30 Apr, 2026
Cost
Document Cost350.00
EMD10000.00
Estimated Cost0.00
Location
CityMulti city
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in foundations & trenches etc.in earth work in all kinds of soil such aspick work,jumper work,blasting work &chiselling work (where blasting work is prohibited),lift upto 1.50 mts. Stacking the excavated soil not more than 3.00 mts.clear from the edge of excavation & then returning the stacked soil in 15 cms layers,when required into plinth,sides of foundation etc. consolidating each deposi-trd layers by ramming & watering and then disposing of all surplus excavated earth as directed within a lead of 20 mts.50.53Cum
2P/L c.concr.1:4:8 (1cement : 4 sand : 8 graded stone aggregate 40 mm nominal size) & curing complete in foundation & plinth.3.89Cum
3Providing form work with steel plates 3.15mm thick welded with angle iron in frames30 x30 x 5 mm so as to give a fair finish i/c centring,shuttering,strutting & propping etc. with wooden battens & ballies, height of propping & centring below supporting floor to ceiling not exceeding 4 mts. &removal of the same for in situ-reinforced concrete & plain concrete work in :-Vertical surfaces such as walls (any thick.) partitions & the like i/c attached pillasters,buttresses,plinth & string courses & the like.130.22SQM
4P/L c.concr.1:2:4 (1cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for RCC work in :-Foundation,footing,bases of columns &the like & mass concrete.38.39Cum
5Providing Tor steel for RCC work i/c bending,binding & placing in position complete upto floor two level.586.00KG
29th Apr, 2026

5 Days Left

WhatsApp