Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Local Self Government Department
Tender ID4445423
Organisation NameLocal Self Government Department
Tender BriefRetender Project No 122/25-26 Machoormala Puthiyathil Madappura Road Maintanance
Last Date For Submission5th Jun, 2026
Opening Date06 Jun, 2026
Cost
Document Cost1100.00
EMD12459.00
Estimated Cost498369.00
Location
CityMulti city
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Retarring and other related works
23.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.267.000sqm
3OD289985/2025-2026:Granular sub-base/base/surface course with serviceable material available(departmental material) during scarifying of existing road. Construction of granular sub-base with departmental material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (Modified 4.11.2)20.025cum
44.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead31.950cum
575.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.60.660sqm
5th Jun, 2026

5 Days Left

WhatsApp