| Tender Brief | Scope Of Work (sow) As Mentioned In Tender And Schedule Of Work( 63 )items As Given Below ,[1] Taking Out Door&window Shutter 50.000 Ea,[2] Lbr F/taking Out Door&window Frame 40.000 Ea,[3] Taking Out&refixg Old Rod,window Frame 100.000 Kg,[4] Weather Coat (single Coat) 120.000 M2,[5] Fixg 60mm Thick Decorative Paver Blocks 2.000 M2,[6] Cutting Kutcha Drain,depth<30cm Ord Soil 2.000 M,[7] Fixg,hydraulic Door Closer,heavy Type 5.000 Ea,[8] Fly Ash Brick Wrk, 110mm, M-7.5, (1:4) 250.000 M2,[9] Fly Ash Brick Wrk,230mm,m-7.5,foundation 25.000 M3,[10] Flyash Br Wrk,230mm,m7.5,super Sturcture 70.000 M3,[11] Fixg Netlon Mosquito Net To The Windows 2.000 M2,[12] Fixg,wash Basin Mixer 1.000 Ea,[13] Fixg,cp Shower Rose 1.000 Ea,[14] Fixg,wall Mixer 1.000 Ea,[15] Fixg,cp Pillar Cock 1.000 Ea,[16] Sup,fit,fix Hygeine Pipe 1.000 Ea,[17] Takg Out Carefully Frm Shuter,wood Bead 30.000 Ea,[18] Fixg,iron Butt Hinge,w/screw,50x30x.90mm 5.000 Ea,[19] Fixg,iron Butt Hinge,w/screw,50x37x1.5mm 2.000 Ea,[20] Cutting Kutcha Drain,depth<30cm Mix Soil 10.000 M,[21] All Types Of Maintenance & Civil Jobs 0.400 Ea,[22] Prvdg,date Catalogue,32x25mm 10.000 Ea,[23] Colour Washing,pigment,int.all Flr,2coat 250.000 M2,[24] Plaster Sand/cement Mortar,4:1,thk10mm 4.000 M2,[25] Pro,fix,float Valve 5.000 Ea,[26] Lbr Chrg F/fab,fixed Glazing 3.000 M2,[27] App,rus,rem,eff Area 5.000 M2,[28] Cra,rep,cut,cra,hard 3.000 M,[29] Dam,pro,tre,rem,loose 3.000 M2,[30] Sea,str,cra,hig,viscous 3.000 M,[31] Dis,pcc,lim,ter, Works 7.000 M2,[32] Plaster Sand/cement Mortar,6:1,thk15mm 25.000 M2,[33] Ms/wi Orntl Grill,gnd Flr,wt10-16kg/sqm 1.000 Mt,[34] Fabrication Of M.s. Structures 1.000 Mt,[35] Prov.,fixing White Makrana Marble 2.000 M2,[36] Fixg Decorative Roller Blinds To Windows 1.000 M2,[37] Providing Single Coat Distemper 50.000 M2,[38] Supply,fitg,fixg,venetian Blinds 2.000 M2,[39] Supply,storage Tank,500ltr 10.000 Ea,[40] Air Entrained Screed Concrete 25.000 M3,[41] Fixg In Position Approved Pvc Door Frame 50.000 M,[42] Fixg,door Frame,pvc 50.000 M,[43] Supply&fixg,pvc Door Shutter 50.000 M2,[44] Supply,fitg,fixg,pvc Door 40.000 M2,[45] Labour F/brickwork Using Old Brick,cm1:6 2.000 M3,[46] Supply & Fixing Of Polcarbonate Sheets 2.000 M2,[47] Supply,erection Of Colour Coated Sheet 5.000 M2,[48] Drying Of Damp Walls/ceiling Etc 5.000 M2,[49] Prvdg&fixg,false Ceiling 1.000 M2,[50] Fixg Door Fitting,stainless Steel Aldrop 5.000 Ea,[51] Fixg,door,fully Casing Tower Bolt 5.000 Ea,[52] Fixing Towe |