| Tender Brief | Scope Of Work (sow) As Mentioned In Tender And Schedule Of Work( 50 )items As Given Below ,[1] Maint,oven 5.000 Ea,[2] Svcg,reversing Winch Drive Mechanism 2.440 Le,[3] Remvng,scrap Etc F/doing Job 0.500 Le,[4] Bf Isolation Greasing & Easing 2164.000 Ea,[5] Co Isolation Greasing & Easing 2164.000 Ea,[6] Sprocket Greasing (both Blocks) 502.000 Ea,[7] Reversing Chain Greasing 492.000 Ea,[8] Reversing Winch Machine Greasing 33.300 Ea,[9] Fixg,spindle Carrier,cotter Pin Etc 3.000 To,[10] Lubg,support,guide,pivot Roller 365.000 Set,[11] Svcg,driving Wheel Etc Of R/car Etc 286.000 Set,[12] Svcg,brg Of All Drive 299.000 Set,[13] Instln,compr 33.000 %,[14] Instln,door Hook G/box 33.000 %,[15] Mkg,centralized Grease Lubg Sys 283.000 Set,[16] Box Damper Greasing 432.000 Ea,[17] Draining,oil Frm All G/box 208.000 Set,[18] Supply,fastener 0.100 Le,[19] Maint,oven 4.500 Ea,[20] Svcg,reversing Winch Drive Mechanism 2.100 Le,[21] Remvng,scrap Etc F/doing Job 0.500 Le,[22] Bf Isolation Greasing & Easing 1919.000 Ea,[23] Co Isolation Greasing & Easing 1919.000 Ea,[24] Sprocket Greasing (both Blocks) 445.000 Ea,[25] Reversing Chain Greasing 436.000 Ea,[26] Reversing Winch Machine Greasing 29.700 Ea,[27] Fixg,spindle Carrier,cotter Pin Etc 2.000 To,[28] Lubg,support,guide,pivot Roller 324.000 Set,[29] Svcg,driving Wheel Etc Of R/car Etc 253.000 Set,[30] Svcg,brg Of All Drive 265.000 Set,[31] Instln,compr 29.000 %,[32] Instln,door Hook G/box 29.000 %,[33] Mkg,centralized Grease Lubg Sys 251.000 Set,[34] Box Damper Greasing 383.000 Ea,[35] Draining,oil Frm All G/box 184.000 Set,[36] Supply,fastener 0.100 Le,[37] Supp,fitting Asbestos Louvres,columns 1.000 Ls,[38] Supply,commng,compr 1.000 Ea,[39] Commng,sys 1.000 Ea,[40] Chng Piston Assy Of Lp,hp Cyl. 1.000 Ea,[41] Supply&fixg Of Pump Parts,piston Rod 1.000 Ea,[42] Fixg,glass W/silicon Paste F/r/car,2x3ft 1.000 Ea,[43] Recond, Kzn 112, Gearbox 1.000 Ea,[44] Constant Hanger Rod Changing 1.000 Ls,[45] Supp,fitting Fill Matl 2.000 Set,[46] Svcg,all Component 2.000 Le,[47] Svcg,m/c 2.000 Le,[48] Supply Of Materials As Per Requirement 1.000 Ls,[49] Supply,item F/revamping Hyd Cabin 1.000 Lot,[50] Fitg,radiator W/hose 1.000 Ea |