| Tender Brief | Scope Of Work (sow) As Mentioned In Tender And Schedule Of Work( 41 )items As Given Below ,[1] Chng,grat Pump At Sgp,no:4 15.000 To,[2] Rprg,granulator Pump In Sgp,no:3 13.000 To,[3] Disman,grab Bucket 15.000 To,[4] Replcg,liner Bush&liner Extension 24.000 Ea,[5] Building Up,teeth Of Sector Gear 21.000 Ea,[6] Rprg,rope Pulley&grdg 2800.000 M,[7] Assyg,grab Bucket,fasteners,brass Bushes 35.000 To,[8] Rprg,both Dehydrator Of Bf Sgp,no:4 5.000 Set,[9] Chng,triplex Chain 4.000 To,[10] Modn,chain Tensioning 4.000 To,[11] Assyg&replcg,hyd Mtr 20.000 %,[12] Replcg,net In 3 Segment 4.000 To,[13] Ern,circular Plate Of Inba Trust 16.000 To,[14] Replcg,blowing Box 13.000 To,[15] Fixg,bracket W/net,28nos 12.000 To,[16] Rprg,mech Submersible Pump In Sgp,no:3 20.000 To,[17] Shifting,grab Bucket 6.000 Set,[18] Shifting,grab Bucket To Despatch Area 6.000 Set,[19] Replcg,vib Feeder 18.000 To,[20] Chng,basalt Pipe¢ral Pipe 16.000 To,[21] Modn,sgp Granulator,no:4 8.000 To,[22] Fab,tail Pulley Str,k6,k7 10.000 To,[23] Replcg,fluid Cplg 8.000 Set,[24] Chng,tripper Car G/box,k7 5.000 To,[25] Preparation,chng Of C3 G/box&align 8.000 To,[26] Replcg,gtu Pulley,k1,k2 16.000 To,[27] Chng,vlv Line 1&2 Of Sgp,no:4,dia600mm 15.000 To,[28] Chng,granulator Pump At Sgp,no:3 16.000 To,[29] Revamping,grat Pump Of Sgp,no:4 12.000 To,[30] Ern,k1&k2 Conv Area 127.000 To,[31] Replcg,gtu Pulley,k1,k2 49.000 To,[32] Dislodging,receiving Tank Metal Jam 13.500 To,[33] Ern,beam After Disman 20.000 To,[34] Chng,basalt Pipe¢ral Pipe 16.000 To,[35] Fab,r/i Bracket,extension Of R/i Shaft 27.000 To,[36] Erec,new Conveyor 800.000 M,[37] Preparation,job Support To Belt Jt 49.000 Ea,[38] Rprg,spare 27.000 Ea,[39] Positioning,spare In Satelite Wrkshop 10.000 To,[40] Rprg,spout 9.000 To,[41] Rectfn,lubg Sys 5634.000 Ea |