| Tender ID | 5023725 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Sh Construction of Abr Spetic Tank At Hadsar Inspection Chamber Rcc Manhole Intel Chamber Cct And Di Pipe Line And Other Allied Accessories Operation And Maintenance For One Month |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 100180.00 |
| Estimated Cost | 5209024.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting / Chiesling in Soft rock in earth work and disposal of excavaed earth with in all leads and lifts as per the direction and entire stisfaction of Engineer-in-charge. | 49.54 | cum |
| 2 | Excavation in foundations trenches in all kinds earth work i.e. pick work, jumper work,hard ballast stacking chiselling etc. stacking the excavated soil not more than 3metre clear from the edge of the excavation and then returning the stacked soil in 15 centimetre layers when required into plinths side of foundations etc., consoildating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in-Charges.90 % Pick Jumper Work | 12.53 | cum |
| 3 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 372.65 | cum |
| 4 | Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal sixe) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts, as per direction and entire satisfaction of the Engineer-in-Charge. | 3.23 | cum |
| 5 | Providing and laying cement concrete 1:2:4( 1 cement:2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth involving all leads and lifts as per the direction of Engineer-in-charge. | 1.10 | cum |