Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4035557 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | (sh- Construction of Zinc Aluminum Storage Tank Of 30000ltrs. Capacity At Phad Meha) (under Pdna At Sr. No. 18220) |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 23 Apr, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 16320.00 |
| Estimated Cost | 815995.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundations, trenches etc., in earth work lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres to the entire staisfaction of Engineer-in-charge with in all leads and lifts. | 28.52 | Cum. |
| 2 | Providing and laying cement concrete 1:3:6 ( 1 cement:3 sand:6 graded stone aggregate 40 mm nominal size )and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts complete in all respect. | 3.92 | Cum |
| 3 | Providing and laying cement concrete 1:1 :3 ( 1 cement :1 sand :3 graded stone aggregate 20 mm nominal size ) and curring complete excluding cost of form work in foundation and plinth in all heights and depths with in all leads lifts and to the entire satisfaction of Engineer incharge. | ||
| 4 | Walls any thikness but not less that 0.10 Mtrs thickness including attached pilasters, buttresses plinth and string courses etc, from top of foundation (level) upto floor two level including all leads and lifts etc. complete in all respect. | 4.42 | Cum |
| 5 | Providing and laying tor steel reinforcement for RCC work including bending binding and placeing in position complete upto floor two level with in all leads and lifts and to the entire satisfaction of Engineer Incharge including cost of binding wires. | 353.60 | Kg. |
5 Days Left