Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4471114 |
|---|---|
| Organisation Name | Rail Wheel Factory |
| Tender Brief | Sun Planetary Gear Assembly For Main Hoist Gearbox As Per Rwf Drawing No.711014413500. The Assembly Includes All The Items With Quantity As Indicated Against Each Item In The Above Rwf Drawing Which Is As Below. (1) Sun Pinion Shaft Rwf Drawing No.711014412700 Qty-1 No. (2) Gear Housing Rwf Drawing No.711014413510 Qty -2 Nos. (3) Pin & Key Pin Rwf Drawing No.711014411930 Qty - 2 Nos. (4) Planet Wheel Rwf Drawing No.721014412690 Qty -2 Nos. (5) Gear Rwf Drawing No.711014412710 Qty -1 No. (6) Spider Arm Rwf Drawing No.711014413490 Qty -1no. (7) Pinion Rwf Drawing No.701014413540 Qty - 1 No. (8) Spacer Rwf Drawing No.701014411950 Item No.1 Qty -4 Nos. (9) Spacer Rwf Drawing No.701014411950 Item No.2 Qty -2 Nos. (10) Pinion Shaft Rwf Drawing No.721014410320 Qty - 01 No. (11)the Supply Should Also Include Sl.no 10 To 21 With Quantity Against Each Item As Mentioned In The Drawing. Note: (1)the Item Should Be Supplied As Complete Set In Assembled Condition. (2) Mtc For Chemical Composition And Hardness Should Accompany The Supply. (3) All The Gears Teeth Should Be Profile Ground. (4)the Firm Shall Be A Manufacurer Of Heavy Engineering Gears/gearbox And Shall Have Inhouse Facilities For Such Gear Manufacturing. Proof Of The Same Shall Accompany The Offer. (5)the Firm Should Have Manufactured And Supplied Sun Planetary Gear Of Diameter 600mm And Abovefor Eot Cranes Of Main Hoist Lifiting Capacity 35ton And Above To Any Of The Government/ Public Sector/pvt. Ltd. Companies.(documentary Evidence In Proof Of Supply For At Least One Supply In The Last Three Years Should Be Furnished Along With The Offer). (6)the Supply Shallbe Guaranteed For Quality, Workmanship And Performance For Minimum Period Of 12 Monthsfrom The Date Of Fitment. (7)firms Should Have Certification For Iso, Iris And Other Standards Revelant To Quality And Manufacturing. (8) Offers Not Meeting The Above Requirements Shall Summarily Be Rejected. ] |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Multi State |
8 Days Left