Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Eastern Railway
Tender ID4529281
Organisation NameEastern Railway
Tender BriefSupply And Installation Of 3 Phase Hog Sequence Testing Kit With 60kva Transformer For Inspection Of Lhb Power Car & Lslrd Coaches With Following Specifications. 1) Hog Sequence Testing Kit Shall Be Suitable For Input Supply Of 3 Phase, 415v With Neutral, 125a Four Poles Mccb Shall Be Provided For Input Supply Side Protection Along With Suitable Rated Supply Chord (pvc) Of Length 10 Meters. 2) Hog Sequencetesting Kit Shall Be Having Output Supply Provision Of 3 Phase With Neutral, 750v Ac With Zs Coupler Socket.3) Uic Jumper Coupler Shall Be Having 16 Pin Male Connector To Suit Conventional Power Car Socket, The Cable Length Shall Be 3 Meters. 4) Hog Sequence Testing Kit Shall Be Having Auto Over Voltage Shut Down Facility. 5) Hog Sequence Testing Kit Shall Be Having The Output Capacity Of 60kva For Power Side And 72 To 110vdc For Control Side. 6) Hog Sequence Testing Kit Shall Have In Built Surge Protection. 7) Hog Sequence Testing Kit Shall Be Having 4 Pole Mccb Protection At 750v Side, With Current Rating 125a. 750v Ac Grade Not Available 690v Mccb Shall Be Used. 8) Hog Sequence Testing Kit Shall Be Having Independent On/off And Rest Provision For Each Output. 9) Hog Sequence Testing Kit Shall Be Having Proper Earthing Protection. 10) Thepower Circuit And Control Circuit Arrangement Shall Be As Per Loco Part Of Drawing. 11) Hog Sequence Testing Kit Shall Be Supplied With Four Wheels Heavy Duty Trolley Two Revolving And Two Fixed One. 12) Hog Sequence Testing Kit Shall Be Powder Coated Paint Of Aqua Green Colour. 13) Hog Sequence Testing Kit Shall Be Supplied Along With User Manual. 14) Demonstration Shall Be Arranged Free Of Cost At Your Side. 15) Hog Sequence Testing Kit Shall Be Suitably Designed At Both Sides. 16) Hog Sequence Testing Kit Shall Be Labeled With Necessary Danger/safety Precaution Instructions Wherever Necessary. [ Warranty Period: 30 Months After The Date Of Delivery ]
Last Date For Submission30th Jun, 2026
Opening DateRefer to Documents
Cost
Document Cost0.00
EMD0.00
Estimated Cost0.00
Location
CityMulti city
StateMulti State

Register to see full details

30th Jun, 2026

23 Days Left

WhatsApp