Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4424212 |
|---|---|
| Organisation Name | Rail Coach Factory |
| Tender Brief | Supply Of Set Of Coupler For Intermediate For Vande Bharat Coaches.(1 Set Consists Of 2 Nos I.e. One Each For Leading & Trailing Coach.), As Per Drawing: Mdts 29411 Rev 00, Packing Instruction: Lhb Cbcs Are Being Used In Two Stages In Rcf And As Per Shop (using ) Practice , It Is Proposed That Lhb/cbcs To Be Packed In Two Wooden Boxes As Per Packing Instruction Here Under :- 1.packing -i:- Un-coupling Device With Hardwares And Other Related Acessories. All Related Hardwares To Be Packed Separately In Jute Packing To Avoid Rusting/corrosion Of Hardwares . Pl No To Be Printed/marked On Packing Slip And 'for Use Of Fur Group' To Be Marked On Box . 2.packing -ii:- One Coupler Head, One Draft Gear With Hardwares And Other Related Acessories. All Related Hardwares To Be Packed Separately In Jute Packing To Avoid Rusting/corrosion Of Hardwares .machined Surfaces Must Be Covered With Corrosion Resistant Paint/substance. Pl No To Be Printed/marked On Packing Slip And 'for Use Of Underframe Group' To Be Marked On Box . Note: (i) Item No. I, Iishould Be Packed In Separate Boxes. (ii) A List Should Be Pasted On Each Box Showing Order No. , Pl No., Description Of Item Drg. No./spec. No., Qty., Firm's Name, Address , User Name As Above & Date Of Despatch Etc. [ Warranty Period: 84 Months After The Date Of Delivery ] |
| Last Date For Submission | 22nd Jun, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Multi State |
26 Days Left