| Tender ID | 4080526 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Urgent Repairs To Culvert Bed, Wing Wall At Canaguinim In V.p. Naquerim Betul In Quepem Constituency Re-tender 1st Call. |
| Last Date For Submission | 5th May, 2026 |
| Opening Date | 07 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 14425.00 |
| Estimated Cost | 721216.00 |
| City | Multi city |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation of foundation of structures of culvert, abntments piers, retaining wall etc in all types of strata comprising any of the materials such as soil, silt, clay gravel murrum of all varieties shingles pebbles all types of conglomerates, laterite rock, ordinary soft rock, disintegrated rock fissured rock shuttered decomposed rock or weathered rock and all such other materials as described under Appendix "A" to those specification either in full or parts as the case may be mechanical mean or any approved method or methods as the case may be convenient or permitted inclusive of chiselling, wedging blasting prohibited etc. in all conditions such as dry moist saturated submerged foul conditions etc. and as directed by the Engineer in - charge including dressing of sides ramming of bottoms including getting out the excavated soft/rock to be levelled & neatly dressed including setting out construction of shoring and bracing removal of stumps & other deleterious matter, dressing of sides & bottom, black filling the excavation earth pumping and bailing of water, carriage and disposal of excavated material barricading danger lighting guarding and disposal of excavated earth as directed by the Engineer - in Charge including all leads and lifts etc. complete. | 56.00 | Cu.m |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 44.00 | Cu.m |
| 3 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : a) All works upto plinth level | 87.00 | Cu.m |
| 4 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete. | 97.00 | Sq.m. |
| 5 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge. A) 110 mm dia | 16.00 | RM. |