Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4243576 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Vikas Khand Bahadurpur Ke Gram Shekharpur Mein Kusaura Sondhiya Link Marg Se Bekaru Chaudhary Ke Ghar Tak Cc Road Nirman Karya |
| Last Date For Submission | 16th May, 2026 |
| Opening Date | 16 May, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 983000.00 |
| City | Multi city |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 indepth and work in embankment tobe in 20 cm. including ramming and dressing the surface to required levels and slopes & also including 1.5m lift & 30m lead including royalty required for proper completion of the work as per direction of E/I of the work including two lead & one lift etc. with royality charges (as per S.I. No. 253(Cartage of Earth upto 3 Km) | 47.61 | Cum |
| 2 | Excavation in Foundation in ordinary soil (Loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches including all T&P etc. complete Rate as per S.I.No. 251 (Schedule Rate) | 42.53 | Cum |
| 3 | C.C. with 40 mm gauge brick balasst,C/Sand & Cement in the proportion of including 1:5:10 supply of all materials labour T&P etc. complete required for proper completion of the work as per S.I. No. 274 | 9.11 | Cum |
| 4 | M-150 Class B/W in 1:4 cement & Coarse Sand finencess modulous mortar in foundation and plinth including supply of all material, labour tools and plants. etc. required for proper completion of work. Rate as per S.I.No. 305 | 44.55 | Cum |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 35.32 | Cum |
4 Days Left