Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4273650 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Waterproofing, Electrification And Plumbing At Kaudgaon (barshi) Taluka And District Dharashiv |
| Last Date For Submission | 20th May, 2026 |
| Opening Date | 21 May, 2026 |
| Document Cost | 300.00 |
|---|---|
| EMD | 3309.00 |
| Estimated Cost | 330853.00 |
| City | Multi city |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Item No.1:-Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. Addn.Spec. No. As directed by Engineer in charge. (SSR 22-23 It.No.46.13) | 1.82 | cum |
| 2 | Item No.2:-Providing and fixing H.D.P container one piece moulded water tank made out of high density polythyler and built corrugated inclusive of delivery up to destination hoisting and fixing of accessories such as inlet,outlet overflow pipe inclusive of all tanks capacity between 200 to 1000 liters Addn.Spec. No. As directed by Engineer in charge. (SSR 22-23 It.No.42.53) | 1000.00 | Ltr. |
| 3 | Item No.3:-Providing and laying damp proof course 50 mm thick in M20 cement concrete layer and bitumen / using cement with waterproofing compound curing, formwork etc. complete. Addn.Spec. No.Bd.J.2 Page One Number 355(SSR 22-23 It.No.31.01 ) | 76.86 | sqm |
| 4 | Item No.4:-Providing and fixing on walls/ ceiling/ floor 15 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Addn.Spec. No. BD.V 5 page 551 and as directed by Engineer in charge (SSR 22-23 It.No.42.55) | 18.00 | Rgm |
| 5 | Item No.5:-Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. Addn.Spec.No. BD.V 5 page 551 and as directed by Engineer in charge (SSR 22-23 It.No.42.57 ) | 14.00 | Rgm |
Closed