Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Energy And Petrochemicals Department
Tender ID5027269
Organisation NameEnergy And Petrochemicals Department
Tender BriefWork Of Environmental Sampling And Analysis As Per Gpcb Requirement, (i.e. Monthly Monitoring Of Stack Emission, Ambient Air Quality And Water / Effluent And Noise Level) At Gsecl, Dhuvaran Gbps Units For Year 2026 And 2027 ( 24 Months).
Last Date For Submission4th Aug, 2026
Opening DateRefer to Documents
Cost
Document Cost1770.00
EMD9011.00
Estimated Cost0.00
Location
CityMulti city
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1ISO-KINETIC Sampling and Analysis of Flue gas emission from the chimney / duct at the sampling point finalized for all the units no. I, II and III (main or bypass stack) and DG set stack of CCPP as and when required, and submission of the report thereof as per the requirement of GSECL / GPCB.72.000Sample
2Measurement of ambient air quality at various stations at DGBPS, for various ambient parameters and the micro meteorological parameters for a period of 24 hours at each station and to prepare WINDROSE for the total period of sampling at all the stations and submission of the report after analysis of the samples, as per the requirement of GSECL / GPCB96.000Sample
3Collection of water / effluent samples of various drains of GSECL, DGBPS from the discharge points in your container of required capacity every month or as and when required by GSECL, preservation of the sample and analysis at your laboratory for the parameters as stipulated by GPCB vide their latest consent and submission of report of samples, as per requirement of GSECL / GPCB.144.000Sample
4Monitoring of Noise level from GSECL DGBPS from various locations in day and night time as prescribed in GPCB consent and submission of report of samples, as per requirement of GSECL / GPCB.24.000Month
5ISO-KINETIC Sampling and Analysis of Flue gas emission from the chimney / duct at the sampling point finalized for all the units no. I, II and III (main or bypass stack) and DG set stack of CCPP as and when required, and submission of the report thereof as per the requirement of GSECL / GPCB.72.000Sample
4th Aug, 2026

14 Days Left

WhatsApp