Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Bhabha Atomic Research Centre
Tender ID3609691
Organisation NameBhabha Atomic Research Centre
Tender BriefCorrigendum : Composite Work Of Development Of Internal Infrastructure For Proposed Dae Exhibition Centre-cum-science Museum Including Civil, Electrical, Mechanical, Lan, Av, Cctv And Other Allied Works In Apsara Building, South Site, Barc, Trombay, Mumbai.
Last Date For Submission23rd Apr, 2026
Opening Date28 Apr, 2026
Cost
Document Cost0.00
EMD2030388.00
Estimated Cost87321000.00
Location
CityMumbai
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Part-1: Civil Works Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of rank vegetation, grass, brush wood etc. complete and as directed by the Engineer-in-charge .
2From 0.00 to 1.50 m depth from Average Ground Level150.00CuM
3Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) with minimum cement content as per the latest revision of relevant IS codes including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels.10.00CuM
4Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 with minimum cement content as per the latest revision of relevant IS codes using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications. Note: (i) In view of limit on water-cement ratio for durability requirements, concrete admixtures (Naphthalene / Melamine based super plasticizers) shall be used after taking prior approval of Engineer-in-Charge and the rates quoted for these items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete. ii) All projections, fins etc. in the concrete surface formed at the joints in the formwork should be ground & flush and finished at no extra cost.
5In substructure (up to Plinth Level)5.00CuM
23rd Apr, 2026