Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4787530 |
|---|---|
| Organisation Name | Maharashtra State Infrastructure Development Corporation |
| Tender Brief | Corrigendum : Construction Of Government Medical College 430 Bedded Hospital Girls And Boys Hostel ( 100 Student Capacity) And Residential Quarters At Dharashiv, Dist. Dharashiv. |
| Last Date For Submission | 24th Jul, 2026 |
| Opening Date | 27 Jul, 2026 |
| Document Cost | 35400.00 |
|---|---|
| EMD | 28534273.00 |
| Estimated Cost | 2853427334.00 |
| City | Mumbai |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting down trees including trunks and branches with girths above 180 centimetre to 270 centimetre and stacking the materials neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression/pit if any. | 50.00 | One Number |
| 2 | Cutting down trees including trunks and branches with girths above 270 centimetre to 450 centimetre and stacking the materials neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression/pit if any. | 50.00 | One Number |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming , watering including shoring and strutting etc. complete. (Lift upto 1.5 metre) By Mechanical Means | 28,408.33 | One Cubic Metre |
| 4 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming , watering including shoring and strutting etc. complete. (Lift upto 1.5 metre ) By Mechanical Means | 16,193.85 | One Cubic Metre |
| 5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5 metre To 3.0 metre) By Mechanical Means | 16,543.05 | One Cubic Metre |
9 Days Left