Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Maharashtra State Infrastructure Development Corporation
Tender ID4787530
Organisation NameMaharashtra State Infrastructure Development Corporation
Tender BriefCorrigendum : Construction Of Government Medical College 430 Bedded Hospital Girls And Boys Hostel ( 100 Student Capacity) And Residential Quarters At Dharashiv, Dist. Dharashiv.
Last Date For Submission24th Jul, 2026
Opening Date27 Jul, 2026
Cost
Document Cost35400.00
EMD28534273.00
Estimated Cost2853427334.00
Location
CityMumbai
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Cutting down trees including trunks and branches with girths above 180 centimetre to 270 centimetre and stacking the materials neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression/pit if any.50.00One Number
2Cutting down trees including trunks and branches with girths above 270 centimetre to 450 centimetre and stacking the materials neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression/pit if any.50.00One Number
3Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming , watering including shoring and strutting etc. complete. (Lift upto 1.5 metre) By Mechanical Means28,408.33One Cubic Metre
4Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming , watering including shoring and strutting etc. complete. (Lift upto 1.5 metre ) By Mechanical Means16,193.85One Cubic Metre
5Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5 metre To 3.0 metre) By Mechanical Means16,543.05One Cubic Metre